Project Roster

Warner Bros.

  • Warner Bros. Movie City is a proposed 15 ha Theme Park situated within a 31 ha parcel of the Yas Island Development located in Abu Dhabi, UAE.
    The project was designed to 100% Schematic Design and included, BIM management of Theme Park, Hotels, Roadways, Parking Garage structures, new site utilities, new highways, roads and major infrastructure projects.

Westfield Corporation

  • Topanga Mall - Site Grease Interceptors & Tommie’s Burger
  • West Covina - Structural In-fills, Steve & Barry’s retail
  • West Covina Macy’s Shell Expansion and Roof
  • Century City Fountains, Ramps, pump station sidewalks, stairs, curbs & gutters
  • Eagle Rock Structural in-fills and exterior façade work

Southern California Gas Company (SCG)

  • Designed gas metering and regulating stations
  • Spearheaded the design and construction of SCG Division Headquarters, Payment Offices and Gas storage facilities

Yves Saint Laurent

  • Yves Saint Laurent, Beverly Hills, CA (95% demolition of existing 3,000 S.F. un-reinforced single story masonry and truss system building. Constructed a three story 10,000 S.F. CMU and Structural Steel building with T.I. build out, Elevators, stair systems $6.5M budget)

Crate & Barrel

  • Crate & Barrel at The Grove, Los Angeles, CA (T.I. build out of a two story 35,000 S.F. retail space with façade work, elevator and hoist systems $6.2M budget)

Tiffany & Co.

  • Tiffany & Co., Century City, CA (Interior remodeling major security and FL systems)
  • Tiffany & Co., Beverly Hills, CA (three story phased remodeling and high end security program while store remained open $5M budget)
  • Tiffany & Co., San Diego, CA (Interior remodeling with HVAC and MEP modifications)

Universal Studios

  • Universal Studios Theme Park and Citywalk, Universal City, CA
  • Shanghai & Mein, ground up construction
  • Wasabi, tenant improvement
  • Pit Fire, tenant improvement
  • Jerry’s Deli, tenant improvement
  • Terminator T2 Attraction (theatre show with action equipment and special effects major stair and elevator systems, pump rooms, chiller plant)
  • Aquazone (interactive fountains, pump station)
  • Universal’s Islands of Adventure Theme Park, Orlando, Florida
  • Jurassic Park Attraction (22 acres, $198M, 28 major Facilities including five story show building with pile foundations, retail, restaurant, chiller plant and major Back of House facilities and utilities)

Walt Disney World, Orlando, Florida

  • Created Environmental Manual designating all permit requirements for company-wide use
  • Blizzard Beach Water Park new construction over 40 buildings, chiller plant, facilities, with major site utilities and infrastructure (64 acres, $100M)